Just edit this element to add your own HTML.
As you can see from the above diagram, there are a lot of parts to a garage door. On the installation of the garage door, we need plenty of room in the garage to lay down the new sections before we take down the old door. We recommend to clean out at least eight feet back into the garage for the technician to have room to maneuver around.
If windows or vinyl insulation is needed, it may take an extended day or two for the manufacturer to process the door. On occasion, specially sized garage doors that are custom ordered are needed to be shipped from the manufacturer located out of state. These tend to require a two week lead time. So if you need garage door installations, please give us a call.